Step 3 prime the roof.
How to install bitumen roofing.
If you install the smooth product cover it with aluminum coating.
Modified bitumen roofing may have a granular surface as shown here or it may be smooth.
Always install flashing around a chimney and other valleys where two roof planes meet as these areas are more prone to leaks if not protected.
These steps show a torch down method which looks a bit scary but actually is not too difficult.
Before you reshingle a roof read our step by step guide for adding new shingles over old ones.
Make sure the roofing is flat and free from creases and bubbles.
Then begin nailing the shingles to the roof working in rows and starting at the edge of the roof.
See below for a shopping list tools and steps subscr.
Beveled wood pieces called horsefeathers must be laid along the thick edges of the shakes to make a fairly flat surface.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
This is an inexpensive roofing material often installed over 15 felt underlayment by homeowners and do it yourself ers.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
To install asphalt shingles start by installing underlayment and new flashing on the roof.
Install the roofing screws vertically along each rib in the panel.
Get a sheet of bitumen roofing and roll it out allowing an extension beyond the perimeter of the roof.
The felt is laid in horizontal courses overlapping the eave ice and water protector by 4 and the valley membrane flashing by 6.
Once you ve done that cut your shingles to size if they re not already.
Asphalt roll roofing installation.
Nail the drip edge in place using your hammer and roofing nails.
There are different primers available for sealing the concrete roofs.
Roll roofing is simplest product to install on a small section of low slope roof is 90 pound roll roofing.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
After attaching the felt to the roof use a primer to prepare the roofing.