You may need to nail through the starter strip into the drip edge.
How to install drip edge flashing on roof.
Slide the corner tight to the fascia.
This will allow for expansion and contraction and prevent buckling.
Using drip edge with a nailing edge approx.
Measure the length of the eave you need to cover with drip edge using a tape measure.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of.
At the eaves when installing the drip edge on top the underlayment a 4 inch wide layer of asphalt roof cement complying with the astm d4586 type i or type ii is required.
Install the starter course.
How to install drip edge flashing to a new roof to install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Select enough lengths of flashing to cover it.
Learn more about drip edge at.
Gaf mastering the roof chapter 05 the drip edge is critical to provide a finished look and to add waterproofing.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
How to install drip edge flashing on a roof hunker.
Place a nail at one end then the other.
The starter course is comprised of a shingle that s roughly half the width of the field shingles.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
The drip edge should be installed on top of the underlayment at all rakes and below or on top of the underlayment at the eaves.