Traditional flashings still work.
How to install lead roof boot flashing.
Seamless lead flashing with cast iron counterflashing recommended for flashing all standard pipe size and cast iron roof penetrations from 1 2 to 12.
Flashing shall be 4 lb.
Roofing how to install lead boot on plumbing vent pipe walkthrough duration.
Tier 1 roofing roof lead plumbing boot installtion jacksonville fl.
After the correctly sized collar has been selected.
And even when installing a better boot flashing i still follow the same preflashing steps to back up the primary flashing.
Do this for all 1 5mtr lengths.
Dress the lead to the required angle with a lead beater.
Having taken the measurements on the roof of the required folds in the lead to fit the job being done using a length of timber mark out the lead along the width of the roll to fold it.
The traditional pipe flashing is a soldered lead riser pipe that encloses the vent pipe and folds in the pipe at the top.
Roofing how to install lead boot on plumbing vent pipe walkthrough duration.
Slide the new rain collar down over the pipe to the top of the existing collar.
Seamless lead with steel reinforced boot and shall permit installation on roofs with up to a 20 degree pitch.
Cut lead sheets to the regulation required length of 1 5mtr on the ground.
Lead flashing squirles.