After attaching the felt to the roof use a primer to prepare the roofing.
How to install modified bitumen roll roofing.
If you install the smooth product cover it with aluminum coating.
Roll roofing and modified bitumen are both suitable for low slope roofs.
Make sure the roofing is flat and free from creases and bubbles.
Modified bitumen is approved for flat roofs with minimal slope but roll roofing is not viable below a 2 12 pitch two inches of rise for each twelve inches of horizontal run with exposed nails or a maybe little lower with concealed nail installation.
The beginning of a peel and stick installation starts out the same as the torch down.
As with other types of modified bitumen materials the cost may be a bit higher than traditional asphalt roll roofing but the additional price is.
Remove the adhesive film.
These steps show a torch down method which looks a bit scary but actually is not too difficult.
How to install peel and stick modified bitumen roofing.
Get a sheet of bitumen roofing and roll it out allowing an extension beyond the perimeter of the roof.
Self adhering modified bitumen roll roofing is designed for flat roofs with a pitch or 4 12 or less typically found over shed type garages and second floor porches.
There are different primers available for sealing the concrete roofs.
Start the process after step 5.