Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
How to install roll shingle roofing.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
Using a measuring tape measure 35 inches 89 cm up from.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Plan so that no two butt joints are closer than 2 feet from each other.
It also helps if you first install a layer of roofing felt.
Apply roofing cement to the roof.
Installing the rolled roofing 1.
To seal a plumbing vent spread roofing.
Spread the roofing cement along the.
Every 5 inches make a new mark until you get to the rop of the roof.
Repeat this on both sides of the roof.
The strips should always be horizontal.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across the roof.
It not only protects the roof but it also protects the fascia.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
How to do it attach first course.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Install peel and stick roofing in a similar manner.
Mark a chalk line to identify the end of your first layer.
Drip edge or drip cap is either plastic or sheet metal.