The strips should always be horizontal.
Install mineral roll roofing.
An underlayment of felt roofing is optional.
Rolled roofing by contrast comes in lighter 75 pound units and is tightly rolled up and sealed.
Spread the roofing cement along the.
Installing the rolled roofing 1.
Cut the rolled roofing.
Mark a chalk line to identify the end of your first layer.
Cements become viscous and difficult to apply at low temperatures.
You can install roll roofing on your own but it goes more smoothly with a helper so grab a friend and get started.
The roofing should overhang the eaves by inch except where you install drip edge flashing on top of the roofing along the rake edge.
Unlike shingles which apply one by one you can roll out a square of mineral surface rolled roof within minutes.
Rolled roofing is easy to transport.
Store all rolls and cements for at least 24 hours at or above 55 f 12 8 c prior to their application.
How to do it attach first course.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
It also helps if you first install a layer of roofing felt.
Fiberglass mineral surfaced roll roofing is installed using mechanical fasteners nailing or hot or cold processes to seal between plies.
If possible install roll roofing over a smooth plywood deck either perpendicular or parallel to the slope.
Apply roofing cement to the roof.
Using a measuring tape measure 35 inches 89 cm up from.
Composite shingles are heavy and unwieldy.
Sbs roofing styrene butadiene styrene is commonly installed as a single ply roof with a 3 1 2 inch selvedge edge overlap.
Temperature be especially careful when installing mineral guard roll roofing in temperatures below 45 f 7 2 c.
Rolls become brittle and may crack at low temperatures.
For extra durability you may install roll roofing in two layers.
To seal a plumbing vent spread roofing.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Bought this roll from home depot.
Rolled roofing goes down quickly.
Plan so that no two butt joints are closer than 2 feet from each other.
This is not a how to video.