The resulting vertically oriented chambers can then be ventilated by bringing fresh air in at the boom and exhausting it out at the top.
Installing metal roof battens.
Always begin working at the point with the longest peak to eave distance.
Use a tool belt that has a hammer loop to hold nails a measuring tape chalk line and a hammer when installing the wood.
Battens elevate the roof tile off the roof deck and this ensures that water drains off the roof.
And then you put down horizontal battens for the roof panel attachment.
Whereas many older metal roofs or metal roofs on larger buildings have been successfully installed over battens rather than solid decking it is the clear preference for residential applications that metal roofing always be installed over solid decking to avoid dangerous and damaging condensation issues.
When installing a metal roof over an existing roof before installing the.
Basically all metal roofs that can be installed on battens can also be installed on solid decking with underlayment.
For example metal roofing will be attached to special metal roof battens.
Can i install the metal roof over the ice shield or do i need the 1 x 4 battens every 2 feet as well it s a low slope roof thus the ice shield for extra protection.
For example horizontal battens run.
I have removed all the old shingles from the roof boards not plywood the roof is in great shape and have installed an ice shield over the roof.
This involves putting down vertical battens first attaching them through the roof deck to the rafters.
The batten seams are covered with batten joint and then the metal sheets are attached at specific intervals.
Not all metal roofs can be installed over battens like that.
How you install battens can affect the drainage efficiency.
Add the metal panels.
Before even considering it make sure the product you re installing is approved by its manufacturer for that type of application.
Take care the first piece is aligned precisely perpendicular square to the edge.