Place the first screw.
Installing roof sheathing by yourself.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
An air compressor with a nail gun will come in handy for nailing large flat areas like this.
Avoid installing osb with the textured side down.
Install osb textured side up.
Start at the highest point and the furthest point from the trash container and take off all the old shingles flashing.
Thickness will range from 3 8 to 3 4 inch depending upon local code.
Choose an exterior c d grade.
Avoid the errors described when installing this roof sheathing.
Install the drip edge on the gable ends of the roof after you finish installing your underlayment.
Install baffles providing a minimum of 1 inch of clear space between framing and or under roof decking at eaves to ensure that ceiling or roof insulation does not block ventilation paths.
Ensure roof trusses are in proper alignment with no curves or uneven sections when installing osb to sheathe roofs.
Starting with how to place the first row of sheathing we cover fastening methods the use of h clips stagg.
For vaulted or cathedral roof construction provide a free ventilation path from eaves to ridge between all rafters.
We go in depth on how to install roof sheathing.
Install the roofing screws vertically along each rib in the panel.
When installing roof sheathing use nails with longer nail shank larger diameter and a larger head than may be required.
Also use more nails and place them closer together to build a stronger roof.
If you come across any large nails that are sticking out either remove them and put them in your debris container or.
Curved or uneven roof trusses will cause osb roof sheathing to warp or buckle under roof coverings.
Use a tin snips to cut the drip edge to size.
Lay asphalt felt paper or special waterproof underlayment such as a self healing membrane over the roof.
When ordering the sheathing divide the total number of square feet of roof surface by 32 square feet a 4 x 8 panel and add an extra 15 for waste.
If you need to reposition your gutters do so at this.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.
Nail it every couple of feet.