Lay the first course of tar paper lengthwise on the roof so one edge is covering the drip edge nailed to the roof.
Installing tar paper on hip roof.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.
Allow about 1 foot 0 30 m of the felt to hang over the hip.
Setting the roll and then nailing off.
Measure the width and height of each section separately.
How to install roofing tar paper step 1.
Measure the size of your roof in square feet.
Adjust the felt as you roll it making sure that it s straight with no bubbling.
For hip type shed roofs which include slopes on all 4 sides begin at the square hip at the top of the roof.
This is how i paper my vallies.
Lay the first strip of tar paper side to side with its bottom.
Before applying roofing you ll need to cover the sheathing with roofing felt also often called tar paper most local codes call for using 30 pound felt.
Never install the felt vertically across your roof.
This video walks through the very basic steps for installing tarpaper felt.
Starting a roof with tarpaper felt.
Position the first row of roofing felt flush on the bottom with the edge of the gutter apron.
Install the drip edge on the gable ends of the roof after you finish installing your underlayment.
Multiply the width by the height for the.
Begin at the bottom edges of the roof and go up.
Use a ladder to reach the bottom level of the roof.
Lay the next strip.
Start at the bottom of one side of the roof at the right or left edge.
Drip edges on the eaves any valley liners and all flashing should be installed before the tar paper is laid.
Chalk lines should be snapped 33 5 8 above the eave line.
Begin your first row of tar paper with the bottom of the tar paper.
How to lay roofing felt on a hip roof.
Measure your roof s surface in square feet and purchase enough tar paper to cover the entire surface twice.
Have a helper ready to assist with this step and take care to get the lines straight and clean.
Use a tin snips to cut the drip edge to size.
Unroll the paper on the roof and cut it to the correct length with a utility knife.
After this lines should be snapped every 34 as you move up the roof.
Roofing felt comes in rolls that feature pre marked lines 2 to 3.
Take a close look at how i paper the 30 in the center of the valley.
Some roofers prefer to attach felt underlayment with 1 inch roofing nails or special nails with plastic washers but most codes allow staples which are easier to drive.
How to install roofing tar paper.
Then i run a r.