Scrape loose paint off the rotted area with a putty knife and use 80 grit sandpaper to smooth the rough surface if.
Installing z bar flashing on siding.
How to hang heavy frame with z bar hanger.
How to install t1 11 siding duration.
Test the rotted area of the t1 11 siding by poking it with a nail or a screwdriver.
This allows you to bend the center part of the flashing over the sides of the door to cover the.
Complete the installation of the first horizontal row of t1 11 siding following standard construction practices.
Install the first length of z flashing.
This weather strip comes in plastic or galvanized metal.
Counter flashing drip or weep stucco screed over a z flashing duration.
Cut half inch notches into the z flashing on both ends where the flashing bends using the tin snips.
Typically the z strip is placed on top of the bottom piece of siding then the next row of siding is placed on top of the z strip.
Z weather strip z weather strip flashing is a great way to protect the horizontal edges when installing siding on your shed.
Begin at either end of the wall and set the level middle.