Project step by step 20 cutting the gutter.
Installing gutter pops.
Form strip miter joint at corner cover the joint between two lengths of gutter at each corner with a strip miter a 3 inch wide strip of aluminum.
Wrap the aluminum strip tight around the underside of the gutter.
Begin by installing a slip joint splice on each end of an inside corner fitting.
How to install a pop up gutter drain.
We provide a fully licensed plumber to do all your gutter.
These drains are attached to the end of a pipe that runs underneath the surface of your yard.
Then trim the first section of the gutter to length with tin snips.
Secure it with eight pop rivets or sheet metal screws.
Cut a triangular section from.
Firmly hit the top of the nails with a hammer to drive them into each point.
Use a square and pencil to mark the gutter length and cut to the line.
Snap a chalk line between the start and end of the gutter run.
Snap the sections together.
It s much easier to join sections on the ground than to work from the top of a ladder.
Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.
Locate the endpoints and hold a nail over each.
Dig a hole underneath your gutter downspout and place a catch basin in the hole.